120072.00 – TAP Range Line Road Sidewalks

City Project#: EN01055
TDOT Project#: 120072.00

Range LineTotal Budget: $223,750 ($179,000 Federal Grant, $44,750 Local CIP)
Current Phase: Preliminary Engineering – Environmental Phase (01/25/15)

This project includes the construction of a sidewalk, curb, and gutter, along sections of the west side of Range Line Road between St Elmo Avenue and Wellons Avenue to complete the existing sidewalk network in the area. The southern 526 feet of the project area will require the construction of sidewalk between the existing sidewalk and the intersection of Range Line Road and St Elmo Avenue. The northern extent of the project will require the construction of sidewalk, curb, and gutter, between the existing sidewalk and the intersection of Range Line Road and Wellons Avenue. Additional intersection improvements will be made at the intersection of Range Line and St Elmo in the form of crosswalks, ADA ramps, and the required regulatory/warning signs. This project will provide a direct link for children in the neighborhood walking to Brookmeade Elementary, Pickett Park, and the North Frayser Community Center.

Advertisements